
Drywall Installation
The crew hangs 1/2-inch board on standard walls and ceilings for every drywall installation, stepping up to 5/8-inch Type X wherever a fire-separation wall calls for it, like the garage wall shared with living space. Screws land every 12 inches on center on walls and closer together on ceilings, set just below the paper without breaking it, and every joint gets tape and compound through the finish level the homeowner picks before the job starts. New-construction framing, additions and gut remodels all get the same fastener pattern and the same square-check before the first sheet goes up, whether it's one wall or an entire floor. Lightweight board comes up on some jobs too, mostly for ceiling work, since it runs about 13% lighter than standard 1/2-inch and cuts down on fatigue during a long overhead session.
The company also frames the metal stud partitions some remodels call for, cutting and screwing track and studs to layout before drywall ever goes up over them. A finished basement or a converted attic follows the same process as any other room. Every hang finishes clean enough that the next trade, whether that's paint or trim, can start without extra prep. The crew checks every seam for flatness before calling a job done, since a hang that looks fine under shop lights can still show through paint once the room's real lighting hits it.

































